All bills

HB 1741-FN

relative to the enrollment and use of distributed energy resource aggregations by electric utilities.

Filed 2026 · Died on the table · Science, Technology and Energy · Energy and Utilities

Official record at gencourt.state.nh.us ↗

Open this bill in the searchable view →  ·  Follow this bill by RSS

On the record

Quoted from the General Court bill status page, not worked out from the docket.

StatusHOUSE
In the HouseDIED ON THE TABLE
Introduced1/7/2026
Floor date2/19/2026
LSR number2724
Local government impactno
Committee codeH24

Bill text (PDF) ↗

Where it stands

House: DIED ON THE TABLE

Every floor vote on this bill was a voice or division vote, so there is no record of how individual legislators voted.

In practice this often ends a bill's progress for the term.

The bill was set aside during the session and never taken back up, so it died when the session ended.

Sponsors

Caplan, Tony(D) Merr 8, Cloutier, John(D) Sull 6, Cormen, Thomas(D) Graf 15, Fenton, Donovan(D) Ches 10, McGhee, Kat(D) Hills 35, Parshall, Lucius(D) Ches 8, Thomas, Wendy(D) Hills 12
Prime sponsor in bold. From the General Court sponsor file.

What happened

Every action recorded in the official docket, in order. Each line ends with the journal or calendar that recorded it; where we have the document, that citation links to it.

Votes

Roll call tallies and individual votes from the General Court roll call files. Presiding, excused and absent are shown separately: one member presides over each House roll call and does not vote except to break a tie.

Lay HB1741 on Table (Rep. Vose)

February 19, 2026 · House · None–None, adopted

Decided on a voice vote. Only the outcome was recorded — there is no count of how any member voted.

Committee reports

Reproduced from the House Calendar in the committee’s own words.

Majority — INEXPEDIENT TO LEGISLATE

Rep. John Schneller

This bill posits an interesting idea to create virtual power plants comprised of aggregated customer-owned utility apparatus and battery capacity from multiple users that utilities can tap during periods of peak demand. The utilities already implement a similar program via NHSaves that uses demand response to achieve peak demand shaving. This program will be expanded in the next triennial energy efficiency plan. Implementation issues will inhibit this bill’s realization in the near term, but the idea can be expanded in the future. Vote 9-8.

Minority — REFER FOR INTERIM STUDY

Rep. Tony Caplan

This bill would enable utilities to put together private energy resources such as batteries, thermostats, electric vehicles, etc. in virtual power plants that are dispatched on the grid at peak times to shave demand. These aggregated power plants have proved a powerful tool to lower electric costs in neighboring states. Although NH utilities have pilot programs in place, this bill asks them to maximize their programs to lower electric costs. The minority believes a Refer for Interim Study motion would be appropriate.

Hearings and recordings

Recordings are the General Court’s own, on YouTube. Start times are estimates unless stated otherwise, and the player opens early.

Page generated 2026-09-03 from data published by the New Hampshire General Court. Granite Record is an independent project, not affiliated with the General Court. The official record always takes precedence. Corrections: [email protected]