HB 1289
establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage.
Status: Killed
This page draws the record — sponsors, votes, hearings, committee reports and the bill text — in the browser, so it needs JavaScript. Everything it shows comes from the files linked below, which need none.
All bills