HB 281
(New Title) relative to flow devices designed to control beaver damming and minimize the risk of flooding behind an existing beaver dam.
Status: Signed into law
This page draws the record — sponsors, votes, hearings, committee reports and the bill text — in the browser, so it needs JavaScript. Everything it shows comes from the files linked below, which need none.
All bills