HB 1160-FN-LOCAL (2002): requiring the state to rebuild and maintain the dam controlling Russell Reservoir in the town of Harrisville.

Cite this page

Granite Record indexes the General Court’s record; it is not that record. Where a citation allows only one source, cite the General Court — every page here links to what it is drawn from. The date below is the day the page was read.

MLA
“HB 1160-FN-LOCAL (2002): requiring the state to rebuild and maintain the dam controlling Russell Reservoir in the town of Harrisville.” Granite Record, https://graniterecord.org/bill/2002/hb1160. Accessed 24 Oct. 2026.
APA
Granite Record. (n.d.). HB 1160-FN-LOCAL (2002): requiring the state to rebuild and maintain the dam controlling Russell Reservoir in the town of Harrisville. Retrieved 24 Oct. 2026, from https://graniterecord.org/bill/2002/hb1160
Chicago
Granite Record. “HB 1160-FN-LOCAL (2002): requiring the state to rebuild and maintain the dam controlling Russell Reservoir in the town of Harrisville.” Accessed 24 Oct. 2026. https://graniterecord.org/bill/2002/hb1160.
BibTeX
@misc{bill-2002-hb1160, title = {HB 1160-FN-LOCAL (2002): requiring the state to rebuild and maintain the dam controlling Russell Reservoir in the town of Harrisville.}, howpublished = {Granite Record}, url = {https://graniterecord.org/bill/2002/hb1160}, note = {Accessed 24 Oct. 2026} }

HB 1160-FN-LOCAL (2002)

requiring the state to rebuild and maintain the dam controlling Russell Reservoir in the town of Harrisville.

  • Status: Killed
  • Term: 2001-2002
  • House committee: Resources, Recreation and Development
  • Subject: Environment - Administration

The Story

It was introduced on June 26, 2001 and referred to the House Resources, Recreation and Development committee. The committee held a public hearing on January 15, 2002. The majority of the committee recommended that the House kill it unanimously, 14–0, and the report was placed on the consent calendar. On January 31, 2002 the House voted to kill it.

Sponsors

Hearings and Sessions

  • January 15, 2002, 1:00 PM: hearing, House Resources, Recreation and Development, RM305,LOB

The Docket

  • June 26, 2001: Introduced and ref to Res, Rec & Dev; HJ78, p1992
  • December 17, 2001: Copy to Chairman on 12/18/2001 Report due on 2/21/2002
  • January 15, 2002: Hearing Jan 15 1:00 RM305,LOB
  • January 23, 2002: Maj Report ITL for Jan 31 (vote 14-0;CC)
  • January 31, 2002: ITL Report Adopted; HJ14, p545

Laws It Would Change

Related Bills

  • HB 1555-FN-LOCAL (2000): requiring the state to rebuild and maintain the dam controlling Russell Reservoir in the town of Harrisville and requiring the department of transportation to convey a certain parcel of land to the town of Harrisville.

From the General Court